Hanegbi Engineering has a team of experienced validation engineers from a variety of industries, who can support you at every stage of the work. The main goal of the validation process is to ensure that the equipment item and/or room is suited to the requirements of the process and the product. We will carry out all the validation stages required by regulatory guidelines (ISO, GMP), verify continuous compliance with the limits defined for the equipment or room, and confirm that they remain stable over time. In addition, we make sure that critical parameters are placed under ongoing monitoring.

We would be happy to provide service in the following areas, among others:

  • Quality risk management (QRM) processes
  • Preparation and execution of validations: IQ, OQ, PQ
  • Receipt and qualification of every equipment item, including preparation of the required documents
  • Validation following a regulatory or process change in existing equipment
  • Periodic revalidation
  • And more

Our expertise spans the full range of validations: validation of cleaning and sterilization processes, temperature mapping for warehouses, cold rooms, and hot rooms, and validation of process vessels, filling machines, packaging equipment, and more. We also fill gaps in procedure writing, including management policies, annual plans (VMP), and equipment-specific procedures.

Main Documents List:

Design Qualification (DQ): At this stage, we verify that the specifications of the system, equipment, or room have been designed to meet all relevant operational and regulatory requirements.

Installation Qualification (IQ): We verify that the installation was carried out according to the defined specifications and the manufacturer's guidelines.

Operational Qualification (OQ): We verify that the system or equipment operates properly under all planned operating conditions, including testing across different operating ranges (temperature, pressure, speed, and more).

Performance Qualification (PQ): We verify that the system or equipment delivers the desired results in actual production processes under normal working conditions. These tests include a trial period in which the system is tested under operational load.

We'd be happy to hear about your needs,
and provide a professional solution for your project.